![]() Once all the runs of conduit are in place and properly connected, the crew fills the trench with cement and the ends of the pipe are directed into and terminate in approved electrical devices or boxes./DS (font: Arial,sans-serif 12.0pt text-align:left \ncolor:#000000)ġ.00000 0.00000 0.00000 1.00000 0.00000 1.63673 Tm Once more, CANTEX PVC Pipe Solvent Cement needs to be applied with a dauber in between each run.Ĥ. Once again, the entire installation process needs to be repeated for every 10 or 20 feet, depending upon the length of the conduit.ģ. Terminate conduits in underground cable vaults (UCV) described in Special Specification, Underground Cable Vault when shown on the plans. See the CANTEX Full Product Line Catalog for determining the NEC 70 spacer requirements for the necessary trade size of the spacers and the required separation space. DESCRIPTION Construct, prepare, replace, and install conduit and conduit fittings of various sizes, as shown on the plans, in a duct bank encased in concrete. Heavy or light equipment can be used to quickly place the product in the trench and home the joints. RED-E-DUCT is designed to accommodate common handling equipment dependent and sized according to the project requirements. The rows of CANTEX PVC Intermediate Spacers are connected for every row of pipe. 160 feet of concrete encased 4Hx4W-6inch Installed in less than 2 minutes. The amount of spacers coordinates with how many rows of conduit are being installed. Once the trench is completed, CANTEX PVC Base Spacers must be placed in rows in the trench. The process begins with the crew digging the trench.Ģ. Once again, the process for encasing Direct Burial and Encased Burial PVC Utility Duct in cement is basically the same as the cement encasement process for Schedule 40 and 80 PVC Pipe. Once all the runs of PVC DB Conduit are in place and properly connected, the crew fills the trench with dirt.ĭB Direct Burial & EB Encased Burial Cement Installation This process is repeated every 10 to 20 feet, depending upon the length of the conduit.ĥ. The pipe is twisted slightly to secure it. Once the pipe is smooth, the correct type of CANTEX PVC Solvent Cement gets applied to the inside of the belled end and the outside of the spigot or “straight” end of the conduit with a dauber.Ĥ. If the pipe has been cut, a reamer tool must be used to remove burrs or debris before cementing. In between each run of pipe, the belled end of the conduit gets cemented to the straight end. ![]() A crew begins by digging a trench for the conduit.Ģ. ![]() Consequently, the ends of the DB PVC Conduit runs are directed into and terminate in approved electrical devices or boxes. For example, smoother select fill dirt would be used as back-fill and there are no above-ground applications for Direct Burial PVC Conduit. DB Direct Burial PVC Utility Duct InstallationĪlthough the direct burial installation for DB PVC Utility Duct is very much the same as it is for Schedule 40 and Schedule 80 PVC Pipe, there are some differences in back-fill requirements and performance capabilities. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |